Compfence
    Back to the blog
    Recycling center

    Waste rooms and building regulations - Is a building permit or notification required?

    2025-10-15
    8 min

    Building regulations for waste storage buildings

    Do you need a building permit for your waste storage building? The answer is: it depends on size and location.

    Attefall rules

    Up to 15 sqm can be built without a permit if: At least 4.5m from property boundary, max 4m height, not in a detailed planned area with restrictions.

    Notification obligation

    Even without a building permit, a building notification to the municipality is often required. Inspectors review the installation.

    Placement

    Distance to property boundary (min 4.5m), distance to other buildings (fire safety), accessibility for refuse collection.

    Municipal variations

    Certain municipalities have their own additions. Always check with your municipality before installation.

    We help you navigate the rules! 070-636 96 71

    Do you need help with recycling center?

    Contact us for a free consultation and quote. We will help you find the right solution for your property.