Waste rooms and building regulations - Is a building permit or notification required?
Building regulations for waste storage buildings
Do you need a building permit for your waste storage building? The answer is: it depends on size and location.
Attefall rules
Up to 15 sqm can be built without a permit if: At least 4.5m from property boundary, max 4m height, not in a detailed planned area with restrictions.
Notification obligation
Even without a building permit, a building notification to the municipality is often required. Inspectors review the installation.
Placement
Distance to property boundary (min 4.5m), distance to other buildings (fire safety), accessibility for refuse collection.
Municipal variations
Certain municipalities have their own additions. Always check with your municipality before installation.
We help you navigate the rules! 070-636 96 71
Do you need help with recycling center?
Contact us for a free consultation and quote. We will help you find the right solution for your property.
